Work In Progress

  1. Update acceptable products already evaluated (Project Manager)
  2. Resolve road widths and then remove links to DP (with RATA)
  3. SW suggestions (Beca Hamilton)
  4. Section 2 Earthworks – consider TCC’s version as an option (Aecom)
  5. M4 vs GAP40 base material (WaiDC with RATA)
  6. Add As built for rain gardens (HCC)
  7. Update As built drawing examples to templates for ease of use (CKL)
  8. Add Town entrance threshold design (M-P DC)
  9. Review and include new terminology drawing D3.1.1A (WaiDC)
  10. Add Private way Producer Statements (WaiDC)
  11. Add Rural Crossing drawing (WaiDC)
  12. Review old Waipa DC rural Roading drawings for possible inclusion (Surveyors Institute)
  13. Review roundabout kerb details (HCC)
  14. Review need for lighting secondary flow paths that use cycleways/walkways (HCC)
  15. Consider wire rope barrier details (HCC)
  16. Wetland drawing Figure 4-6 needs updating, and further details on reducing silting in soakage devices (HCC)
  17. Add wetlands sign board (HCC)
  18. Add Way Finder cycleway signage (HCC)